Meeting Date; May 17, 2016

STAFF REPORT

AGENDA ITEM: Resolution Authorizing the City Clerk to File and Record a Notice of Completion with the County of Merced for the Well #13 Arsenic Removal Treatment System.

MEETING DATE: May 17, 2016

PREPARED BY: Alfonso Manrique, Alternate City Engineer

REVIEWED BY: Odi Ortiz, Interim City Manager

clip_image001

RECOMMENDATION:

1. Accept the work as complete.

2. Authorize the City Clerk to record a Notice of Completion with Merced County.

3. Authorize the Interim City Manager to release Payment and Performance Bonds and to make final payment of retention monies to TNT Industrial Contractors, Inc. following the expiration of 35 days from the date of recordation of the Notice of Completion.

BACKGROUND:

The City of Livingston’s Well #13 produces water with an arsenic concentration in excess of the Maximum Contaminant Level of 10 µg/l. In May 2013, the Division of Drinking Water (formerly Department of Public Health) issued the City a compliance order for failing to comply with Health and Safety Code Section 11655(a)(l) and (3).

On December 16, 2014 the City awarded a contract to Loprest Water Treatment Company for the supply of an arsenic removal treatment system at Well # 13. On March 17, 2015, the City awarded a contract to TNT Industrial Contractors, Inc. for the installation of the arsenic removal treatment system at Well #13.

TNT completed the installation of the arsenic removal treatment system on February 5, 2016 at which time the system was deemed operational by the Division of Drinking Water. TNT finished addressing the punch list items at Well #13 on April 22, 2016 at,which time their contract was satisfied.

DISCUSSION:

The project’s construction phase started in March 2015 and the major work consisted of construction of an arsenic removal treatment system at the City’s Well No.13.

The Contractor completed all work within the time required by the Contract Documents. The project was successfully completed per the approved plans and specifications.

PROJECT COST SUMMARY

Contract Amount

$ 598,238.00

Change Orders

$ 8,151.15

Actual Construction Cost

$ 606,389.15

Final inspection has been performed and the work has been found to be in compliance with the plans and specifications. Therefore, the work should be accepted as complete and a Notice of Completion filed. If no claims are filed within 35 days after recordation, the Payment and Performance Bond should be released; and retention in the amount of $30,319.46 should be paid to TNT Industrial Contractors, Inc.

FISCAL IMPACT:

The final construction contract cost inclusive of all authorized work was $606,389.15. The project was funded through a low interest loan from the Drinking Water State Revolving Fund.

ATTACHMENTS:

1. Resolution 2016-

2. Notice of Completion

RESOLUTION NO. 2016-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LIVINGSTON FOR THE ACCEPTANCE OF THE WELL NO. 13 ARSENIC REMOVAL

TREATMENT SYSTEM PROJECT, AUTHORIZING THE CITY CLERK TO RECORD A NOTICE OF COMPLETION WITH MERCED COUNTY AND AUTHORIZING THE INTERIM CITY MANAGER TO RELEASE PAYMENT AND PERFORMANCE BONDS AND TO MAKE FINAL PAYMENT OF RETENTION MONIES TO TNT INDUSTRIAL CONTRACTORS, INC.

WHEREAS, the City advertised the Project on February 2, 2015; and

WHEREAS, the City received and the Deputy City Clerk publicly opened bids on March 2, 2015; and

WHEREAS, the City Council awarded a contract to TNT Industrial Contractors, Inc. in the amount of $598,238.00 for the construction of a new wellhead treatment system for the removal of arsenic at the City’s Well No. 13 on March 17, 2015; and

WHEREAS, the Public Works Department and City Engineer have completed a final inspection of the Project and recommend final acceptance; and

WHEREAS, upon approval of the final acceptance of the Project by the City Council, the City Clerk will record a Notice of Completion with Merced County and the Interim City Manager will release Performance and Payment Bonds and the retention monies due the Contractor 35 days after the recording date.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Livingston hereby:

1. Adopts a Resolution to accept the Well No. 13 Arsenic Removal Treatment System Project.

2. Authorizes the City Clerk to record a Notice of Completion with Merced County.

3. Authorizes the Interim City Manager to release Performance and Payment Bonds and to make final payment of retention monies to TNT Industrial Contractors, Inc. 35 days after the recording date.

Passed and adopted this 1ih day of May, 2016, by the following vote:

YES:

NOES:

ABSTAIN:

ABSENT:

clip_image002

Rodrigo Espinoza, Mayor of the City of Livingston

ATTEST:

I, hereby certify that the forgoing resolution was regularly introduced, passed and adopted at a regular meeting of the City Council of the City of Livingston this 1]1h day of May, 2016.

 
 

clip_image003

Antonio Silva, City Clerk of the City of Livingston

image